Please turn on your javascript Syednivas syed ibrahim - Electrical Engineer - Dar Al-Riyadh - Rafha, Saudi Arabia

Summary

Dear

I am a Registered Electrical Engineer with a decade of experience in Electrical Engineering and Project Management with a proven track records in construction industry both contracting and consultant . A very good team player with analytical thinking and ability. Such projects handled include High rise buildings infrastructure medium voltage, low voltage BMS system, Telecommunication network, automation, and Government & commercial buildings and familiar with international codes and standards.

Projects

MOH infrastructure project

Experience

Company Logo
Electrical Engineer
Dar Al-Riyadh
Mar 2011 - Present | Rafha, Saudi Arabia

1) Reviews of shop drawings related and ensure its compliance with designs, contract requirement and properly coordinated with other discipline.
2) Review Material submittal and construction schedules to ensure construction quality and sustainability.
3) Review equipment selection including, transformers, switchgear, Motor Control Centers, distribution panel boards, cabling and termination units for power and lighting loads.
4) Review all procedures of testing and commissioning performed by the Contractor.
5) Review the relevant As-Built drawings and make sure that all site conditions are properly addressed.
6) Review and initial monthly invoices related to my discipline.
7) Attend weekly meetings as directed by Project Manager.
8) Coordination with Saudi electrical company for its requirements.
9) Coordination with Mechanical for Water Treatment Plant, Irrigation System, portable and fire water distribution network system Electrical Material approval and systematic Drawings approval.
10) Ensures that all the works done are in accordance with the approved electrical drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
11) Check all materials and equipment as delivered on sites and ensure its compliance with approved materials and specification
12) Coordinates with Client representatives for any site instructions and inspection of works
13) Confident in viewing contractors work method of statement and material submittals.
14) Review and evaluate contractor’s monthly progress through all our Site Area Managers and report to the area manager.
15) Ensure quality of work is in compliance with contract requirements, good practice and only approved materials are used.
16) Make sure that all site inspections are carried out as per intervention points marked in the approved Inspection and Test Plan.
17) Attend weekly meetings as directed by Project Manager.
18) Participate in t

Company Logo
Electrical Engineer
Al-Najdain East for Contracting Company Riyadh,KSA
Jun 2009 - Feb 2011 | Riyadh, Saudi Arabia

a) Installed and Tested systems are Earthing system, Lightning system, Lighting system, Power outlets,Main Distribution panel(MDP),Emergency Main Distribution Panel(EMDP) and Sub-Panel Boards.
b) Indtalled and tested system are fire alarm system, DATA/Telephone system, Clock System, Public Address System, Centralized CCTV System and MATV System, Access Control System, Security System and B.M.S, Elevators, Treatment Water System, Portable Water System, Irrigation System, Chiller units, Fire Fighting System and related interface with required systems.
c) Installation of Package subsatation it consists of Ring Main Unit(RMU), Distribution transformer(500 KVA,1000 KVA),and Low voltage distribution panel.
d) Installation and testing of SF6 (Sulfur Hexafluoride) circuit breaker.
e) Continually find solutions to conflicts in structural/architectural/mechanical/electrical drawings and specifications by conferring with the Consultants.
f) As a member of the Project Site Team, my duties include being able to perform layout work competently, accurately and efficiently
g) Coordinate inspections with consultants and authorities as required by the contract.
h) Submit SCR (site clarification request) to Consultant if it needed.
i) Monitor installation of all electrical Systems According to the latest revision of IFC drawings or Shop Drawings.
j) Assist Project Superintendent by enforcing quality control,expediting subcontractors
k) Continually update drawings with changes as issued by Consultants
l) Review shop drawings for conformance with the contract and ensure information is communicated to Foreman and Superintendent
m) Management all subcontractors and following up implementations.
n) Inspect and test all material submitted by all subcontractors to be comply with the specification of the project
o) Present oneself as a candidate for promotion by learning and understanding construction methods and developing good construction management skill

Company Logo
Electrical Engineer
Siemens Dimatic Middle East LLC, (Dubai)
Sep 2008 - May 2009 | Dubai, United Arab Emirates

a) Making program Siemens 300 serious Modules, SCADA, and HMI
b) Maintenances Siemens PLC, SCADA, HMI, Servo Motor, variable Frequency Drives, Inverter, PID Controller, Encoder, Relay, Sensors and Circuit Breakers.
c) Electrical Supervision of Testing and Commissioning.
d) Preparation of work history sheets according to site condition, type of work and materials involved.
e) Daily work schedule and instructions give to Site Electrical Supervisor.
f) Updates SAP with actual Man power for each work request executed by the Reliability Supervisor and Technicians.
g) Preparing of reports and sending recommendations to Reliability Senior Engineer Project.
h) Punch List Clearing and Line Checking.
i) Maintaining Manpower Shift duties.
j) Preparation of Bill of Materials.
k) Involved in the Work of Quality Assurance/Quality Control Engineering.
l) Maintaining of Safety and Quality aspects.

Company Logo
Design Site Engineer
Dowa High Temp Furnace Ltd, (India)
Jun 2007 - Aug 2008 | Bangalore, India

a) In the field of industrial Automation which includes programming, testing, Commissioning, and servicing responsibilities.
b) Hardware configuration and programming of PLC systems: Siemens S6-series,Mitsubishi PLC and LG PLC(XG5000 SERIES,MASTER K120 SRIES)
c) Programming of SCADA systems: (MOVICON, I conics and Spec view- Honeywell) and Wide practical experience with communication protocols MODBUS SERIAL, MODBUS TCP/IP, Profibus and Ethernet.
d) Hardware configuration and programming of HMI systems REDLION (G304, G306, G308, G310) and Proface HMI.
e) Preparation of I/O List, Flow Chart, Sequence of operation, Project schedule, Ladder Logic and panel testing
f) Preparation of Project Report and Documentation.
g) Designing Electrical diagram with using AutoCAD.
h) Drives Programming and Various Braking Method.
i) Support for PC hardware and software. Knowledge of operating systems: Windows NT/2000/XP, Windows95/98 & Vista
j) Maintaining of Safety and Quality aspects.

Company Logo
Assistant Electrical Engineer
Sand Fits Unit II
Jun 2006 - May 2007 | Coimbatore, India

a) Installing and Testing systems are Earthing system, Lightning system, Lighting system, Power outlets,Main Distribution panel(MDP),Emergency Main Distribution Panel(EMDP) and Sub-Panel Boards.
b) Installation and testing of 3 numbers 11KV/440V substation compressing of 1000KVA Transformer substations.
c) Installation and testing of 3 number Vaccam Circuit bresker,and 2 number of Air Circuit breaker.
d) Planning and execution of scheduled Preparation like maintenance programs scheduled preparation, Erection team preparation, Commissioning team preparation, Material purchases list preparation.
e) Responsibility included but not limited to the overall Electrical and Electronics maintenances of the plant 66/11KV Transformers and substation, Inter locking system, motor from 0.1 hp to 400hp, Eddy Current and VFD (variable Frequency drivers), induction motors,Diesel generator, Relays etc…
f) Monitoring the QA/QC Documentation of the subcontractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirement, and also reviewing radiographic films.
g) Supervision and Implementation of maintenances and Erection.
h) Responsible for the maintenances PLC and HMI.
i) Maintaining Manpower Shift Duties.
j) Preparation of Bill of Materials.
k) Maintaining of Safety and Quality aspects.

Education

Anna University
Bachelor, Bachelors, Bachelors in Technology, Electrical and Electronics Engineering‎
Electrical and Electronics
2006

Skills

Expert Instruments Drawing
Intermediate PLC
Intermediate SCADA
Expert Social Studies Subject Command

Languages

Intermediate Arabic
Intermediate English
Expert Tamil
Intermediate Urdu
Intermediate Hindi